Walk-In Chamber for Altitude Simulation Testing

Bellue’s BE-8203 series provides reduced-pressure chamber configurations for altitude simulation projects. Confirm specimen dimensions, pressure profile, electrical interfaces, and the applicable test method for the quoted system.

Technical Parameters

Product Name Altitude Simulated Test Chamber
Model BE-8203-5m³ BE-8203-12m³
Internal Dimension W1600 X D2400 X H1300mm W2000 X D3000 X H2000mm
External Dimension W2050 X D2700 X H2200mm W2450 X D3300 X H2900mm
Equipment weight Approx 6 ton Approx 9ton
Power Supply AC 380V,6.0KW AC 380V,8.0KW
Pressure Range 10.0KPa—101.3KPa (Adjustable)
Pressure Reducing Time Less than 30 min
Pressure Recovery Time Less than 30 min
Pressure Maintenance ≧10 hours
High Tension Terminal 4 pieces, Max. DC 500A,1000V
Low Tension Terminal 4 pieces, Max. DC 500A,1000V
Data Cable Interface 2 groups, DB9 line
Observe Window W400 X H600 mm
Auto Door Adopt hydraulic automatic open design
Inner Material SUS304# stainless steel+45# steel
External Material SECC steel plate,powder painted
Power Supply AC 380V,6.0KW
Other Requirement PLC touch screen control + computer remote control.Can be charged and discharge in vacuum condition.

The inner chamber has signal wire interface.

Lighting system and video monitor system

Slide rail installed, the test object can be carried into and out automatically.

 

Standards and Method Review

UN 38.3 includes an altitude simulation test for cells and batteries. Confirm the applicable manual edition and complete test procedure for the project. A separate battery-pack operating test must be scoped against its own approved method.

Details to Define in the RFQ

  • Specimen dimensions, mass, loading arrangement, and chamber access.
  • Required pressure profile, pressure reference, temperature conditions, and exposure duration.
  • Any charging or discharging requirements, including voltage, current, cables, and feedthroughs.
  • Monitoring, controls, site utilities, and acceptance criteria.
Scroll to Top